Scheduling is one of
the major concerns when planning a bathroom renovation Virginia
remodeling. Depending on the scope of work, your project could take
anywhere from one week to a few months. Factor in special orders or relocating
plumbing fixtures and this schedule could extend even longer.
While much depends
on the speed of your contractor, a typical time line looks something like this:
Initial Stages
You’ve decided that
a bathroom remodeling project is required and in the budget. The first stage of
this project involves meeting with potential contractors to go over the design
and draw up a quotation. This process takes about one to two weeks
from initial contact, depending on your availability and the number of
contractors you choose to have quote.
Some contractors ask
their clients visit the company showroom to sign a contract or view product samples.
This can often be done within the above time period, assuming the contractor
delivers their quotation within a reasonable span.
Once the contract
has been signed, material selection begins. This process may take one to
four weeks, depending on your tastes and preferences. An extensive
bathroom remodeling in Virginia involves several types of materials, from
flooring and tile, to bathroom fixtures, cabinetry and lighting. You may have
to visit several different retailers to view samples, or spend hours online
browsing web catalogs.
Delivery and Demolition
The second major
stage of a bathroom renovation involves waiting for the materials to arrive.
Demolition can be completed simultaneously, but only if the homeowner has
reliable and convenient access to another bathroom. If not, the demolition
process (which typically lasts between 1 and 5 days) should be
done immediately following installation to minimize downtime.
Delivery of
materials can stretch for a long time, depending on the type of materials ordered
and the jobsite location. Many contractors recommend sourcing local building
materials where possible, or ordering from Virginia retailers to cut down on
transportation costs and wait time. For standard materials, expect a lead time
of 4 to 7 days, and 4 to 6 weeks is not unheard of
for special order lead times.
Installation and Clean Up
The final stages of
your Virginia bathroom remodeling project are coming up. Things get exciting
from here on, with flooring installation, electrical and plumbing work and
vanity installation helping to bring the room together.
Depending again on
the scope of work, installation time ranges from 2 to 3 weeks.
This could happen in stages, with each tradesman requiring a span of time to
work in the room. Experienced contractors know how to stage the project in
order to optimize efficiency and ensure that work moves smoothly from day to
day.
Always allow for
wait times during the installation process. Tile grout needs to dry or cure,
flooring may need to set and paint needs to dry. All goods things come to those
who wait, or in this case, a quality built bathroom comes to homeowners who
wait.
Clean up often takes
just one or two days. Smart contractors handle this throughout
the course of installation and end the project with minimal finishing work and
clean up.
Bathroom remodeling
in Virginia requires a significant amount of work. Understand the elements of
each stage and learn how to value the time spent on quality work. Don’t rush
things, but instead allow your Virginia contractor to take the time required
for job well done.